3 Steps to Prepare Your Supply Chain for the Next Crisis

This article was published in Harvard Business Review, a credible and valuable source in the field of business.

Authors: Christian Schuh, Wolfgang Schnellbächer, and Daniel Weise

...

No one can say they weren’t aware of the possibility of a global pandemic or of the numerous border disputes around the world causing increased volatility. Conflicts resulting from heightened geopolitical tensions could easily unbalance the entire semiconductor industry, but such disasters can be partially mitigated with sufficient risk monitoring.

Indeed, most of the risks that a company will face do not fall into the category of what the mathematician and philosopher Nassim Nicholas Taleb termed “black swan” events: random, highly improbable events that have enormous impact. A trade dispute, a viral epidemic, a product failure, a cybersecurity breach, a tsunami—these are not black swans but, as the business writer Michele Wucker memorably puts it, “gray rhinos”: highly probable, highly predictable, high impact, but neglected threats that are charging toward the company like a crash of rhinos (who show visible signs of aggression and whose attacks can thus be predicted nearly 100% of the time).

In other words, they are “when,” not “if,” events—and this means they can be prepared for.

For many CEOs, preparing for something that may not happen on their watch will seem like a luxury they can ill afford. But, in fact, the benefits of doing so are not just about protecting on the downside. CEOs building resilient companies can expect to profit on the upside too:

  • Companies that are well prepared and as a result prosper in a crisis can expect to recover more quickly than their competitors. In a review of corporate performance during the past four U.S. downturns (since 1985), Boston Consulting Group (BCG) found that 14% of companies increased their sales and their profit margin.

  • Investors are starting to reward companies that build for the future by becoming more innovative and more resilient. In June 2020, during the depths of the Covid-19 pandemic, BCG surveyed major institutional investors and found that nine out of 10 believed it was “important for healthy companies to prioritize the building of business capabilities—even if it means lowering earnings-per-share guidance or delivering below consensus.”

So, CEOs have every reason to prepare for the next crisis—and no reason not to. But how, exactly, should they do it? They need to start building long-term resilience now. If they wait until the next crisis strikes, it will be too late. We recommend three steps.

Create a world-class sensing and risk-monitoring operation

To get a clear view of the likely risks in their supply chain, CEOs need to invest in risk intelligence and strategic foresight, creating a team of procurement superforecasters equipped with the latest artificial intelligence (AI)–powered sensing technology. Effective risk-monitoring operations should encompass not only direct (or Tier 1) suppliers but also indirect (or Tier N) suppliers who operate deep within the supply chain.

Also, it should take account of eight essential risk categories:

  • Four associated with individual suppliers: operational, financial, reputational, and structural risks

  • Three associated with a supplier’s country or region: disasters, geopolitical, and fiscal risks

  • One associated with a supplier’s industry: industry risks

Within each of these categories, there are three or four specific risks. For example, a supplier’s structural risk might be its dependence on one or two Tier 3 suppliers or its involvement in a hostile-takeover bid. A supplier’s geopolitical risk might be its operations in a war zone or a territory that imposes tariffs and other trade barriers. And a supplier’s industry risk might be its dependence on one or two monopolistic suppliers who then suffer a production delay.

Having established a framework, CEOs need to feed it with data linked to specific key risk indicators (KRIs). For example, operational KRIs might be the age of a supplier’s machinery or the percentage of employees in workers’ unions; industry KRIs might be the concentration of suppliers that could lead to bottlenecks, or a supplier’s R&D into innovative technology and the likelihood of obsolescence; while disaster-risk KRIs might be the number of people vaccinated in the country and at the supplier or the number of power outages suffered by the company.

With this data, and with the help of an AI-powered algorithm, the specific risk can be plotted on a two-by-two matrix, with the Y axis reflecting the detectability of the risk and the X axis reflecting the impact of the risk (see figure 1-1). The four quadrants of the matrix correspond to:

  • Limited risk: Hard-to-detect events that have a noncritical impact. If a risk is deemed to be limited, then it can be deprioritized and occasionally reviewed for any increased detectability.

  • Manageable risk: Easy-to-detect events that have a noncritical impact. If a risk is found to be manageable, then it can be subject to automated tracking and daily review.

  • Disruptive risk: Hard-to-detect events that have a critical impact. In this case, a company must establish its likely probability, hedge proactively, simulate any possible negative impact, and prepare a reaction plan.

  • High risk: Easy-to-detect events that have a critical impact. Here, a company must actively monitor the situation and take urgent steps to reduce the risk.

FIGURE 1-1

Risk matrix

Risk matrix

Once assessing where the risk falls on the matrix, companies are in a good position to determine what they need to do next.

Simplify your product portfolio

In the past few years, it has been the goal of companies to give consumers what they, as individuals, really want. Niche, highly personalized, “segment of one” products and services have become the norm. The trouble is that many of these products are low margin, lack a strategic purpose, require a broader range of suppliers, and lead to higher manufacturing, freight, and out-of-stock costs.

For these reasons, CEOs should look to scale back their product portfolios. That means eliminating some product lines and modifying the remaining products by simplifying their design, harmonizing their specifications, and standardizing their constituent raw materials, components, and other ingredients, as well as their packaging materials.

De-risk your supply chain

CEOs need to consider a series of risk-mitigation actions that encompass the three elements of the supply chain: sourcing the raw materials, components, and other parts of products; manufacturing the products; and delivering the parts to the factories and the products to the customers.

Take manufacturing, for example. CEOs should review their make-or-buy strategy, consider investing in digital technologies such as 3D printing, and above all, switch manufacturing to locations at home (reshoring), closer to home (near-shoring), or closer to consumer markets (regionalization).

The fast-fashion industry has long valued local manufacturing—primarily for speed. It now enjoys the additional benefits of lower supply chain risk. Similarly, Unilever has invested in highly mobile “nanofactories” housed in 40-foot shipping containers that can be sited pretty much anywhere, as need dictates.

CEOs should also consider taking back control of their supplies of critical raw materials and components. They can do this in a couple of ways.

During the last semiconductor shortage, we helped the CEO of a U.S. technology company prepare for the next (that is, the current) shortage by encouraging him to have his company develop contractual relationships with companies that are instrumental in every stage of the semiconductor supply chain—and with which they previously had no direct relationship. These include semiconductor vendors (such as Infineon and NXP), foundries (such as Taiwan Semiconductor Manufacturing Corporation [TSMC] and GlobalFoundries), integrated-circuit makers (such as JCET and Amkor), and distributors (such as Avnet and Arrow Electronics).

Another way to take back control is to take ownership of vital components. This is what Tesla has done by designing and making its own microchips.


As CEOs tackle today’s crises, it might seem perverse to have to start preparing for the next one. But it is essential that they do so. By taking the steps we’ve outlined, CEOs will ensure that their companies are well positioned for the rebound in the post-crisis phase.

TAKEAWAYS

Most risks that a company will face are not random, highly improbable black swan events. In fact, most can be predicted and prepared for. Doing so entails taking three steps:

✓ Create a world-class sensing and risk-monitoring operation. Look into essential risk categories (including supplier, regional, and industry risks) and assess how likely a risk is to occur.

✓ Simplify your product portfolio. Don’t rely too much on highly personalized or niche “segment of one” products and services. Instead, eliminate some product lines and modify the remaining ones by simplifying design, harmonizing specifications, and standardizing their components.

✓ De-risk your supply chain. Consider making changes in three areas of the supply chain: sourcing raw materials and components; manufacturing products; and delivering parts to the factories and the products to the customers.